Wiring Method and Test Process of High Current Generator

Wiring Method and Test Process of High Current Generator

1. Connect the power supply, connect the current output terminal to the primary side of the tested current transformer, and connect K1 and K2 to the secondary side of the current transformer. Short circuit the normally closed switch, otherwise the test cannot be carried outPS: In practical applicat

VIEW MORE
What Is the Load State Tested by the Empty Load Tester

What Is the Load State Tested by the Empty Load Tester

The load state of a transformer refers to the load it bears during actual operation, which reflects the working condition and health level of the transformer.Copper loss (also known as wire loss or resistance loss) is the energy loss caused by the current passing through the winding of a transformer

VIEW MORE
What Does the Demagnetization Function Eliminate

What Does the Demagnetization Function Eliminate

Demagnetization refers to the elimination or reduction of residual magnetism accumulated in power equipment due to long-term operation through specific methods. Residual magnetization can have adverse effects on the performance and safety of equipment, therefore demagnetization is one of the importa

VIEW MORE
What is DC leakage current?

What is DC leakage current?

The current generated when a direct current voltage is applied at both ends of the insulation material can be divided into two parts: volume leakage current and surface leakage current. The current values of these two parts are generally very small, measured in microamperes (μ A); The size of the l